The SH1 Papakura to Drury improvement is a significant infrastructure project, enhancing the capacity and safety of State Highway 1 between Papakura and Drury. Led by Fulton Hogan, the project required a substantial labour force.

Onsite Projects supplied labourers, hammer hands, carpenters, leading hands and machine operators from the outset of the project in May 2021 to completion in November 2024, supporting Fulton Hogan and other key contractors. 

Our carpentry crews were involved in constructing the new Park Estate Bridge, building three bridges over Drury railway lines, the installation of noise walls, stormwater box culverts and multiple large retaining walls.

The project required a high volume of concrete, with our team boxing, pouring and finishing large concrete pours and installing the slip form centre barriers over the whole project. 

Onsite Projects’ machine operators worked on diggers doing bulk loading, site clearing and digging channels for drainage crews, and as water cart operators keeping dust levels down throughout the project. Our ground crews were kept busy installing Aco drains.